New moulds assembling

There will be two types of basis in the banks of proofs, one of them will be made of asphalt and the other one will be made of concrete.

img-20160614-wa0002

The asphalt slabs have been obtained as we described before: asphalting an area with 4 square meters and cutting it. However, the concrete slabs must be smaller, 0,25 square meters.

The moulds construction for these concrete beds has been started.

img-20160617-wa0004